Pascal and Francis Bibliographic Databases

Help

Search results

Your search

kw.\*:("AJUSTEMENT PRODUCTION")

Results 1 to 12 of 12

  • Page / 1
Export

Selection :

  • and

OPTIMUM PRODUCTION LOT SIZE MODEL FOR A SYSTEM WITH DETERIORATING INVENTORY.MISRA RB.1975; INTERNATION. J. PRODUCT. RES.; G.B.; DA. 1975; VOL. 13; NO 5; PP. 495-505; ABS. FR. ALLEM.; BIBL. 8 REF.Article

PRODUCTION PLANNING WHEN DEMAND IS INCREASING.HASTINGS NAJ.1975; INTERNATION. J. PRODUCT. RES.; G.B.; DA. 1975; VOL. 13; NO 5; PP. 519-522; ABS. FR. ALLEM.; BIBL. 2 REF.Article

OPTIMAL MULTI-PRODUCT PRODUCTION SCHEDULING AND EMPLOYMENT SMOOTHING WITH DETERMINISTIC DEMANDS.YUAN JSC; HOREN JH; WAGNER HM et al.1975; MANAG. SCI.; U.S.A.; DA. 1975; VOL. 21; NO 11; PP. 1250-1262; BIBL. 15 REF.Article

A DYNAMIC LOT SIZING ALGORITHM WITH CAPACITY CONSTRAINTS.EISENHUT PS.1975; A.I.I.E. TRANS.; U.S.A.; DA. 1975; VOL. 7; NO 2; PP. 170-176; BIBL. 5 REF.Article

EXACT AND APPROXIMATE COST FUNCTIONS FOR PRODUCT AGGREGATESZIPKIN P.1982; MANAGE. SCI.; ISSN 0025-1909; USA; DA. 1982; VOL. 28; NO 9; PP. 1002-1012; BIBL. 26 REF.Article

AN ANALYTIC FRAMEWORK FOR EVALUATING ROLLING SCHEDULESBAKER KR; PETERSON DW.1979; MANAG. SCI.; USA; DA. 1979; VOL. 25; NO 4; PP. 341-351; BIBL. 9 REF.Article

ON "FURTHER RESULTS ON PLANNING HORIZONS IN THE PRODUCTION SMOOTHING PROBLEM"JOHNSON RE; MCCLAIN JO.1978; MANAG. SCI.; USA; DA. 1978; VOL. 24; NO 16; PP. 1774-1776; BIBL. 3 REF.Article

MULTI-ITEM PRODUCTION SMOOTHING MODELS WITH ALMOST CLOSED FORM SOLUTIONS.WELAM UP.1975; MANAG. SCI.; U.S.A.; DA. 1975; VOL. 21; NO 9; PP. 1021-1028; BIBL. 2 REF.Article

PRODUCTION SMOOTHING WITH FLUCTUATING PRICE.PEKELMAN D.1975; MANAG. SCI.; U.S.A.; DA. 1975; VOL. 21; NO 5; PP. 576-590; BIBL. 14 REF.Article

AN EOQ MODEL WHEN PRODUCTION STANDARDS ARE ASSUMED TO BE NORMALY DISTRIBUTED.SOYSTER AL; ENSCORE EE.1975; INTERNATION. J. PRODUCT. RES.; G.B.; DA. 1975; VOL. 13; NO 5; PP. 507-517; ABS. FR. ALLEM.; BIBL. 18 REF.Article

PRODUCTION SMOOTHING UNDER PIECEWISE CONCAVE COSTS, CAPACITY CONSTRAINTS AND NONDECREASING REQUIREMENTSKORGAONKER MG.1977; MANAG. SCI.; USA; DA. 1977; VOL. 24; NO 3; PP. 302-311; BIBL. 8 REF.Article

PRODUCTION SWITCHING HEURISTICS FOR THE AGGREGATE PLANNING PROBLEMMELLICHAMP JM; LOVE RM.1978; MANAG. SCI.; USA; DA. 1978; VOL. 24; NO 12; PP. 1242-1251; BIBL. 17 REF.Article

  • Page / 1